October 18, 2009
Mr. Bart Schile
Owner , Lake Keowee Marina
105 Lake Keowee Marina Dr.
Central, SC, USA 29781
Dear Mr. Bart Schile:
I am excited to submit my proposal for the addition of vertical storage. The establishment of this new kind of storage will increase the economic and social benefits of Lake Keowee Marina. I believe I can provide you with a well-thought-out analysis of the problem and present viable solutions to increase the profitability of dry storage units.
I propose to study solutions to the problem of the limited storage and expansion of Lake Keowee Marina.
Thank you for considering this proposal. Please do not hesitate to contact me if you have any questions.
Best Regards,
Jake Roush
Encl.
A proposal to investigate the advantages of vertical dry storage
October 18, 2009
Prepared for:
Mr. Bart Schile
Owner, Lake Keowee Marina
105 Lake Keowee Marina dr.
Seneca, SC 29781
Submitted by:
Jake Roush
213 Morris st.
Central, SC 29630
(555) 555-6969
Jroush@clemson.edu
Table of Contents
Executive Summary 4
Methods 4
Possible Solutions to Investigate 4
Action Plan 4
- What Has Been Done So Far 4
- What I Will Do 5
Qualifications 5
Budget Estimations 5
Proposed Schedule 5
Conclusion and Recommendations 5
References 6
Executive Summary
Lake Keowee Marina has become limited in the overall economic returns. Therefore, without raising the, already high, slip dues; the marina is stuck with a fixed yearly budget and increasing costs. This fixed yearly budget is coming from, fully occupied amount of in water slip space, which is regulated by Duke Energy.
I propose to evaluate the economic costs and benefits of the establishment of a more mechanized vertical storage facility. I will determine the factors that are involved with mechanization, building and marketing of the largest facility on Lake Keowee. I will explore different possibilities for increased efficiency in property design and managerial experience for the greatest economic return on this investment.
I can accomplish this study and present these results for $1000. The benefits will be a substantially increased income with a more effective managerial basis for the sustained return in the future.
Methods
Land use is going to be a large problem for the marina. First, the location of the vertical storage units will have to be established. Second, a suitable location with sufficient water depth will have to be found with respect to the storage building. Planning of the current docking system will have to be reformatted to adjust for the launching and retrieval of watercraft on a continual basis. Third, office locations, parking, and landscaping will have to be addressed. Finally, the accounting of this new system will need to be approached and analyzed for the greatest return.
Possible solutions to investigate
1. Relocation of office and shop
a. Increased efficiency
2. Redirect traffic
a. On and off of the water
3. Building restrictions
4. Water conditions
Action Plan
What Has Been Done So Far:
- I have contacted Duke Energy in regards to limitations of the property deed.
- I have found extensive statistical documentation of the demand for dry storage.
- I have conducted extensive research on the development of vertical storage units.
What I Will Do:
Create a management plan for the construction and development of the new facility and the economic concerns associated with it.
- Review paper and internet-based literature
- Examine records for limitations
- Study recent papers
- Identify usable statistical data for marketing
Qualifications
I am currently enrolled in Clemson University studying how to effectively establish and manage vertical marine storage facilities. Also, I have 75 years of background in the marine industry.
Budget Estimations
Cost
Facility Establishment $1.2 Million
Fork Lift $500,000
Property Restoration $50,000
Maintenance/Repairs $5,000
Parking $20,000
Marina Office Restoration $10,000
Total 1,785,000
Proposed Schedule
The vertical storage facility will have to be on a very stringent schedule for the reduction in accruing costs. Therefore, we will allow for one year to develop and management plan and will have construction completed within 18 months. We will also break up the development into three stages which will allow for a cost reduction if we fall behind schedule from one phase to the next.
Conclusion and Recommendations
In conclusion this project will require a very large amount of contributed capital; however, in return, there will be a large amount of profit to be made. Therefore, without the right management there is a high risk for failure.
I recommend the usage of all the aspects I have previously stated along with my managerial expertise in this ever changing economy.